Type of Structure: Dam
The Bowman team had to install a new gate with 3 phase lifting electrical motors.
Bowman Constructors engineered the crane lifts and related steel fabrications to make the project a success.
Type of Structure: Dam
The Bowman team had to install a new gate with 3 phase lifting electrical motors.
Bowman Constructors engineered the crane lifts and related steel fabrications to make the project a success.