Type of Structure: Wooden pier with concrete deck
The existing pier was severely deterorated. Tidle work was required, some of the replacement work was below low tide elevations.
Bowman Constructors engineered a concrete placement method using sheeting and temporary pumps to place concrete mud slabs for the new wooden/stone pier structure. Bowman engaged marine barges to accomplish the work.